Service
Primary Suite Remodels & Additions in Southlake, Keller & DFW
Spa-grade primary bath remodels, expanded closets, coordinated bedroom refreshes — and ground-up primary suite additions when the existing footprint can't accommodate the design vision. Design-build by Swanson Renovations. 7× Best of Houzz.
A primary suite remodel reworks the bath, the closet, and often the bedroom together as a single coordinated project. Most luxury primary suites we touch in Southlake, Vaquero, and Westlake span 350-700 sq ft of total suite footprint and land in the $145,000 to $385,000 range. A primary suite addition — building a new suite onto the existing home — typically runs $250,000-$575,000 depending on size, foundation requirements, and roofline complexity.
What a primary suite project looks like at Swanson.
The primary suite is where most of our clients spend the first and last fifteen minutes of every day. It’s also where the architectural conventions of the late-1990s and early-2000s have aged out hardest — the oversized corner whirlpool nobody uses, the half-wall shower with the sliding door, the under-lit double vanity, the closet sized for the wardrobes of a different decade.
We approach the primary suite the same way we approach a kitchen: Our team walks the space, asks how you actually use it (do you take baths? do you cook in here? how many clothes hang in the closet, and how often?), and the design follows the lifestyle. The drawings come later, when the lifestyle questions are answered.
Two scopes we run most often.
Primary suite remodel.
The existing footprint stays. The bath, closet, and often the bedroom get full reworks. Budget: $145K-$385K. Timeline: 12-16 weeks construction. Common in Vaquero, Carillon, Estates of Southlake — homes where the suite is generously sized but the layout has aged out.
Primary suite addition.
A new primary suite is built onto the home — typically single-story off the back, occasionally a second-story addition. The existing suite often becomes a guest suite or office. Budget: $250K-$575K. Timeline: 16-26 weeks construction. Common when the original suite is small, poorly oriented, or distant from the rest of the master-bedroom-floor flow.
The four moves we make most often inside a primary suite.
1. Remove the corner whirlpool, rebuild the shower as a frameless walk-in.
The corner whirlpool was the early-2000s primary-bath status symbol. Today’s clients don’t use them — they cool too fast, take too long to fill, and the access angle is awkward. We almost always remove them. The space becomes a larger frameless walk-in shower (often with a bench, sometimes with steam) or a freestanding soaking tub for clients who actually take baths. Budget impact: $25-65K.
2. Rebuild the vanity with proper task lighting.
The pre-2010 double vanity was wide but under-lit, with a single light bar above the mirror that cast every shadow. We rebuild with a furniture-style base in custom millwork, integrated drawer storage organized around how you actually use the bath, cosmetic-grade task lighting (CRI 90+ at 2700K — the temperature that makes makeup application reliable), and a stone slab top selected from the yard with you. Budget impact: $35-85K.
3. Expand or redesign the closet.
Pre-2010 closets were sized for fewer clothes than people now keep. We expand into adjacent rooms when scope allows, or redesign the existing footprint with a custom closet system (drawers, hanging zones organized by category, jewelry-and-accessory drawers, sometimes an island, often a charging station for devices). Budget impact: $25-95K.
4. Rework the bedroom itself.
Often the under-considered part of the suite. We refine the ceiling treatment (often raised tray ceiling with integrated lighting), add a headboard wall in millwork or fabric upholstery, integrate built-in dressers if floor space allows, and design the lighting layer-by-layer (no more single overhead fixture). Budget impact: $20-60K.
What’s included in a Swanson primary suite contract.
For remodels: bath (full demo + rebuild), closet (full system), bedroom (millwork + lighting + paint), MEP rework, permits, design service, project management, daily cleanup.
For additions: foundation, framing, roofing, exterior finishes, full MEP, all interior finish-out, plus all of the above plus ARB submission and approval. The contract is structured in two phases (shell + finish-out) for additions, with a single closing walk-through.
Process snapshot.
- Discovery call (20 min, free) — remodel vs addition, neighborhood, timeline, budget direction.
- In-home consultation with Chad (90 min, free) — Our team walks the existing suite, asks lifestyle questions, identifies whether scope is remodel or addition.
- Design agreement signed — 8-12 weeks of design + (for additions) architectural drawings and ARB package.
- Itemized estimate.
- Construction contract.
- Construction (12-26 weeks depending on scope).
- Final walkthrough.
Recent primary suite projects.
Serenity Master Bath · Pure Gold Master Bath · Tranquil Master Bath · Southlake Master Suite Addition · Marbled Master Bath · Southlake Gold Master Bath · Transitional Elegance Bathroom
Ready to talk about your primary suite?
Talk to Chad about your project — the first conversation is sixty to ninety minutes in your home, free, no pitch.
Frequently asked questions
What's included in a 'primary suite' project?
Primary suite REMODEL versus primary suite ADDITION — what's the difference?
What does a primary suite REMODEL cost?
What does a primary suite ADDITION cost?
How long does a primary suite project take?
Can we stay in the house during a primary suite project?
What's a 'spa-grade' primary suite?
Do you do master suites in Vaquero, Carillon, and Timarron?
Inquire
Talk to Chad about your primary suite remodels & additions.
First conversation is sixty to ninety minutes in your home. Free, no pitch.
Inquire